10/03/2026
Work has begun on the Gulf Shore branch!
While some of the modules have been standing since we set up, they have never been connected. Many of these tables were new from our last set up back in 21, but the wiring was never finished. Now that the mainline is predominantly done, turning our attention to what will be the busiest branch on our layout.
While the main was down on the table seen below, the two industries only had their switches. Last night, we added the actual spurs off those switches. The larger space to the back is going to be “Coastal Bend Cold Storage” and the one in the front is “Seabreeze Distribution” (a corn syrup transload facility used by Coca-Cola).
Further on, going into the next modules, there a large grain facility, a DEF distribution center, a chlorine chemical company and a transload area. Additionally, there is a yard just beyond the industrial area that will serve the branch.