22/06/2026
LOCAL HISTORY – POWER SUPPLY:
An electricity sub-station was built circa 1955 as the village had grown and the supply by cable from Daventry could not cope with the peak demand, with the voltage dropping very considerably.
Information from ‘The Three Hamlets of Woodford cm Membris’, J.W. Anscomb, 1995.
Woodford Halse Archive Trust contact details:
Phone: Ron Davison, 07768 682614 or 01327 261889. Alternately, please contact Ron by text or via a private Facebook message.
Group email: [email protected]