27/07/2026
Over the last two Sundays, a start has been made on relaying the cross line which connects both sides of the main loop. The old formation was scrapped away, and then more clay soil removed to allow for a deeper solid bed for the track.
In the main exhibition hall, painting the walls continued, and the magneto on the Ransomes MG2 removed for servicing as there is a lack of a spark.
Across in the workshops, our latest tractor restoration, an International TD9, is progressing. However, a more important investigation into a wiring fault on our farm tractor, a John Deere 2650, has taken up some of our time. A broken wire in the cab roof was eventually found and repaired.
Next Sunday is our monthly public open day, so maintenance resumes on the third Sunday in August.