06/03/2026
NOTICE: Reconstruction of Main Street E. and W. Palmerston.
Palmerston Full Steam Ahead; Building a Better Main Street – Spring 2026 to Late Fall 2027
https://www.town.minto.on.ca/business/palmerston-full-steam-ahead-building-a-better-main-street
* Expect minor delays.
* Reminder: Obey all signage and directions by Traffic Control.
* During 2026, Through Traffic is being maintained, at times with 1 controlled lane with a maximum width of 4.0 m.
* Wide loads, oversized vehicles, & some farm equipment may not be able to be accommodated. Operators are advised to plan alternate routes where possible, using caution in this area.