Spare Time Knitting

Directions

Spare Time Knitting During the winter when it's cold, I like to pick up a pair of knitting needles and knit sweater.

A size 4 baby hooded cardigan I just completed. The mittens were extra that were requested too.
10/04/2026

A size 4 baby hooded cardigan I just completed. The mittens were extra that were requested too.

Almost done this sweater I've been working on. I started using yarn I had on bobbins from past projects until I was gett...
09/20/2026

Almost done this sweater I've been working on. I started using yarn I had on bobbins from past projects until I was getting too much of some colours. So I started using leftover yarn from past projects just to give it an eye-catcher with all the colours. I didn't realize I had so many bobbins though. Lol

I finally finished off the afghan.  Adding the fringe to the top and bottom brightened it up a bit.
09/04/2026

I finally finished off the afghan. Adding the fringe to the top and bottom brightened it up a bit.

I'm also in the process of knitting another sweater using leftover yarn I had on bobbins from past projects. The neckban...
08/30/2026

I'm also in the process of knitting another sweater using leftover yarn I had on bobbins from past projects. The neckband and sleeves will probably be black. The front and back will be several mixed colours

The afghan I've been working on is all together. Now I'm adding a black and white fringe to the top and bottom.
08/30/2026

The afghan I've been working on is all together. Now I'm adding a black and white fringe to the top and bottom.

Almost done stitching the first border on the afghan I'm working on. I still have to knit the border for the left side.
08/13/2026

Almost done stitching the first border on the afghan I'm working on. I still have to knit the border for the left side.

I thought I'd get the zipper sewn on this Tree Of Life cardigan while sitting in the motel room this morning in Wingham,...
08/02/2026

I thought I'd get the zipper sewn on this Tree Of Life cardigan while sitting in the motel room this morning in Wingham, Ont. I still have a little touching up to do on it. I'll do that when I'm home.

21840 stitches later, the tractor trailer image is completed. Now I have to add some to the top, bottom and sides to cen...
06/05/2026

21840 stitches later, the tractor trailer image is completed. Now I have to add some to the top, bottom and sides to center it out and make an afghan. I'm just not sure yet what I'll do. Open for suggestions though.

My current project. Still about 40 rows to complete the image.
06/02/2026

My current project. Still about 40 rows to complete the image.

I just have to get a zipper and sew it on then this Tree Of Life cardigan will be completed. I found the pattern on the ...
05/23/2026

I just have to get a zipper and sew it on then this Tree Of Life cardigan will be completed. I found the pattern on the Mary Maxim website.

Address

Millbrook, ON
K0L1B0

Website

Alerts

Be the first to know and let us send you an email when Spare Time Knitting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category