The hydro electric power house at the Pondage release gates.
The pondage holds 5,200 megalitres of water.
Its main job was to catch sudden surges of water from the large hydro station.
This controlled release protected the Goulburn River from fast-flowing floods while supplying farms downstream.
Construction of the Power House (1990s)
Local water authorities and power companies planned a new small plant at the release gates to capture wasted energy.
Construction on the small power house began in 1994.
The project cost 14 million Australian dollars.
The 4.5 MW single turbo-generator opened in 1995.
It began producing renewable electricity by reusing water already destined for the river.
How It Works Today
Water flows from the large 135 MW Eildon Power Station into the pondage.
The pondage power house runs a single turbine using this moving water before it enters the Goulburn River.
The site is owned and operated by Pacific Blue.
The area is also popular for trout fishing and recreation.